▲ 156 r/MelbourneTrains
Driver doing manual “arriving at” announcements
u/CreamIsThicMilkSMH_2 — 5 days ago
In line with plans to electrify to melton, overhead wire gantry’s have been included in the design .
A tram seems to be stuck at RMIT (unsure why) causing trams to be backed up Swanston street. Everyone on these trams have been deboarded