Sigen installer help
Hi all, I’m doing some framing work at home and getting the wall ready for a Sigenergy 6 kW inverter with a 9 kWh battery.
Before I close it up, does any installer know the bracket centre spacing for these units? I’m just wanting to make sure I’ve got solid fixing where it needs to be, and whether I should throw in a couple of extra studs/nogs while I’ve got the wall open.
Cheers.