Hello. Ask ko lang po about this requirement for net metering po. In my case po nag papa-waive po ako nang REC Meter base. As per diagram dina po kailangan ang sa Blue line connecting inverter to rec meter.

Ngayon po ni rerequire po nila ako nang disconnecting switch or lockable breaker. In case na mag maintenance po ang grid wala pong dadaloy na kuryente sa grid from my inverter.

Kailangan ko pa pobang ilagay both the items na naka attached? Or kahit isa lang po ang ilalagay. And in case man po anong rating ilalagay po namen? Naka 12kw hybrid inverter po ako.

u/Glittering_Theme_129 — 15 days ago

I have queries to you guys. Hope you can help me. My family is planning a reunion to be held at Canada abt year 2029. 3 siblings of my mom currently residing there and can provide and fund for our stay there. My mom and the 5th sibling of my mom is currently residing in Philippines, and was planning to bring them along with us with my own family. Key notes for my family

  1. I'm a seafarer earning about 250k per month, wife is a teacher and currently hired, 2 daughters 6yrs old and 3 yrs old, 1 house and lot, 1 car, my agency is local from PH, having 6-7digits savings gradually till 2029
  2. Mom is currently hired as a teacher also 53 yrs old, Dad is 56 yrs old retired OFW, and my younger brother 17yrs old unemployed and will attend college on 2029. Not much savings but can provide. 1 house and lot car and motorcycles.
  3. My moms' youngest sibling (5th), unemployed, 1 daughter (still in high school), no husband, no savings.

Sponsors in Canada can provide invitation letter and suggested that we apply seperately per family to reduce the risk of rejection. Do any of us have any chance of securing the tourist visa?

Ps. I am planning to ask my agency to apply me for a US C1/D visa for my work.

reddit.com
u/Glittering_Theme_129 — 23 days ago