
UPDATE: on new cement pad not level enough.
Ended up doing the 4x4 box with 3/4- pack to make it perfectly level. Cut the 4x4 to make the box level and filled and tamped. 2 5/8x4.5” lag bolts in each corner and used L brackets to secure the box to the pad. Thing is solid. Tub comes Friday…..