
▲ 2 r/Flooring
Prep for LVP
I’m planning on pouring self leveling concrete tomorrow to level out a basement floor for LVP install. I thought the existing floor would be more absorbent than it was - used one bottle of diluted Primer T - only used about 1/2 of the diluted solution. Should I go back over it once it’s dried with undiluted primer?
First time pouring SLC and don’t want to mess it up. Picture is immediately after priming - no issues if I need to do it again, I just want it to setup properly for my pour tomorrow.
u/ILurk018 — 1 day ago