
Victron MP2 + 48V 5kWh battery for UPS-only, no PV, no export
I'm building a power backup for a small stormwater pump using the above parts. As an engineer I'm doing as much I can DIY but will bring in my regular electrician to connect it to the house electrics once I'm confident there is a mutually-understood path to completion.
Can anyone explain the process and timing of applying to the local lines company (Unison) for connecting a Victron Multiplus 2 to the network? I'm trying to figure out how I can test my system off-line, powered with my generator if needed.