Behringer supply issues

What is everyone doing to find Behringer consoles, stage boxes or record cards? Suppliers will happily take my money but can’t give ANY delivery date. Months, a year? Huh?

Really?

reddit.com
u/Less-Pair6695 — 19 hours ago

Advance and walk through checklist

Here is a new checklist I made. Any suggestions? Share?

Event Advance Checklist
Event Basics
Event date

Venue/location

Contact list for all key people prior to the event

Doors open

Event start/end time

Load-in time (4 hours recommended)

Strike/load-out time

Audience size (in-person + virtual)

Parking / loading access

Elevator / stairs / distance from loading

Venue restrictions or union requirements

Walkthrough scheduled?

Production & Technical
Virtual event format (Zoom Meeting / Webinar / other)

Whose platform/account is being used?

Livestream destination(s)

Recording required?

Backup recording plan?

Remote presenters or guests?

Remote speaker expectations/tech support required?

Copyright-sensitive segments?

What deliverables are required after the event?

Expected turnaround time?

Presentation / Playback
Who is operating PowerPoint/playback?

Whose laptop is being used?

Playback position location

PowerPoint feed required to livestream?

Clicker required?

Confidence/downstage monitor required?

Video playback requirements

Any remote presenters controlling slides?

Audio
Number of microphones required

Wireless handhelds?

Lavalier microphones?

Mic runner for audience questions?

Stationary audience mic stands?

House audio feed available?

Need to provide feed back to house AV?

Playback audio requirements

Performer backing tracks?

Branding / Media
Branding assets received?

Logos/lower thirds/holding slides

Sponsor logos

Endorsement/pre-recorded videos

Final media delivery deadline

Who approves final assets?

Internet / Streaming
Hardline internet available?

Upload speed confirmed?

Tech Advance / Crew Meeting
Ensure all crew understand their roles, responsibilities and schedule, training?

Walkthrough Checklist
Access / Logistics
Confirm load-in route

Confirm parking/unloading

Confirm staging/storage area for gear

Confirm setup footprint

Confirm strike/load-out path

Crew meals?

Stage / Presentation Area
Check curtains/background

Determine branding placement

Confirm podium/speaking positions

Confirm performer locations

TV / Projection / Displays
Confirm TV/projector size

Confirm TV/projector location

Photo / Media Area
Select photo-op location

Confirm backdrop fit

Confirm lighting placement

Confirm traffic flow

Confirm power access

Determine drape requirements

Audio Path
Speaker placement

Mic locations

House audio integration

Cable routing safety

Internet / Streaming
Router/modem location

Hardline access

Upload speed test

Camera sightlines

Power
Stage power

Tech table power

Photo area power

Cable paths

Breaker access/load concerns

Program Flow (onsite confirmations)
Program / Run of Show ETA? Working doc online?

Fundraising segment placement

Video cue points

Backing track usage

Audience Q&A format

Remote speaker timing

Final Media / File Checks
Final slideshow status

Video file testing

Lower thirds, slides, PowerPoint, Videos

Local copies downloaded

Backup playback copy available

reddit.com
u/Less-Pair6695 — 1 month ago