
▲ 2 r/Concrete
Patio Slab Joints
Green lines would be wet joints. Thoughts?
u/Maleficent_Nerve4607 — 1 day ago

Green lines would be wet joints. Thoughts?
Had to rip board for double picture frame and adjust the miter to match. This is so I get full boards that will line up. Thoughts?
I have an 1-1/8” gap from my house to starting board. I want my kick up to match. Any ideas?
Deck is perfectly level with no slope. Poured the concrete piers and put 1” dome on accident which raised beam to perfectly level with house rather than slight slope away from house. Water proofed with flashing and ledger flashing. Plan to use composite decking running pallell with house. Any concerns? Thanks!
Can these be used with double 2x10 for deck beam?