u/MaxBroome

Image 1 — Roast (improve) my SECOND conduit run
Image 2 — Roast (improve) my SECOND conduit run
Image 3 — Roast (improve) my SECOND conduit run
Image 4 — Roast (improve) my SECOND conduit run

Roast (improve) my SECOND conduit run

If you didn’t see the original - this is my second attempt at running EMT for my bosses office. This run is on the opposite wall as the other one.

I got lots of feedback saying I should have just cut the t-grid; so I did that. As well as a bigger box, and straighten my couplings.

My boss specifically asked for 5 drops here, not 6. Don’t kill me please.

u/MaxBroome — 9 hours ago

Roast (improve) my first conduit run.

First time ever doing anything with conduit - just for my bosses office, so it doesn’t really matter all that much.

I know I over did it on the stub-out to the ceiling tile, 30° was too much; how much do you guys normally do?

How’s my box offset, that was way harder than I thought it would be, and it still doesn’t look right.

LV isn’t my full time job, i’m 20.

u/MaxBroome — 3 days ago