u/ModestRobot0215

How do inspectors get away with being morons?

So today I replaced a few 100A meter mains in a condo complex and we have already done 20 up to this point. The normal inspector is on vacation and they sent in an inspector from a 3rd party company. The underground feed is an 1 1/4” rigid and I went into a hub. Then the inspector tells me that he we should have used the concentric knockouts to size and a ground bushing. I said “show me where it says this in the book” and he replied “I don’t care what the book says, that’s what I want”

Where do they find these clowns?!

reddit.com
u/ModestRobot0215 — 1 day ago