Mercor changed my work-trial material and deadline without notice
I did a work trial and was wondering whether this was normal.
When I started the work trial was presented to me as Project X and I studied the material on Project X in preparation for the assessment.
The initial deadline (which didn't appear until a couple of weeks into the trial) was set at Oct 3 but I received a one-day expiration notice on Sept 29.
I logged in and discovered that the deadline had been moved from Oct 3 to Oct 1 and that the work-trial had been renamed/changed to Project Y.
So there are two issues:
The trial had apparently shifted from Project X to Project Y without any notice and I was expected to study different material.
The deadline was changed from 10/3 to 10/1 and the expiration email said I had 1 day left even though the dashboard showed 2 days remaining.
The open-book assessment itself makes clear that it's based on a completely different set of material. It says:
“Everything in this assessment is graded against the Project Y guidelines attached below.”
It then directs the candidate to read those guidelines before proceeding. The document is 180+ pages long.
I'm curious whether this kind of thing is normal with Mercor work trials. Has anyone else had the project/materials or deadline changed during a trial without being notified?