u/OkWelcome6293

Dollar Tree "gooning" incidents in Colorado Springs and El Paso County lead to lawsuit

Dollar Tree "gooning" incidents in Colorado Springs and El Paso County lead to lawsuit

Dollar Tree’s chronic understaffing and lack of security measures have made stores nationwide a “hunting ground” for sexual assaults involving what’s known as “gooning,” the act of public masturbation, a new Colorado lawsuit alleges.

The lawsuit, filed last week in El Paso County, alleges a woman shopping with her child and mother was victimized in March 2025, when a man followed the family around a Dollar Tree in Colorado Springs and ejaculated on her.

That man was arrested and charged with indecent exposure and aggravated unlawful sexual contact, according to the lawsuit. The same man had previously been involved in a similar incident at another Dollar Tree in Colorado Springs in December 2024, but was not banned from the chain, the lawsuit alleges.

archive.ph
u/OkWelcome6293 — 1 day ago

Colorado Springs Community-First Data Center Standards

Mayor Yemi's office released their Community-First Data Center Standards.

It has 6 points:

  1. Colorado Springs residents and businesses will not subsidize private development.

  2. Colorado Springs' water is one of our community's most valuable resources.

  3. All large load user projects must be a good neighbor.

  4. Every data center must meet Colorado Springs' development standards.

  5. We Will Welcome Community Contribution

  6. We Will Protect the Public’s Voice

 

coloradosprings.gov
u/OkWelcome6293 — 6 days ago

COS City Council to hear Project Taurus appeal on September 17th, 9 AM at the Pikes Peak Center for the Performing Arts

City Council has scheduled the appeal for Project Taurus, the proposed data center on Garden of the Gods Rd. The project was previously approved by the Planning Department in June. The appeal of that decision was heard by the Planning Commision in July, who voted 6-2 to move the plan forward with conditions. This is the appeal of that decision. If you wish to make a public comment or contribute to the record, please email allcouncil@coloradosprings.gov with your name and address. The maximum number of citizen comments is 120, and speakers are on a first-come, first-serve basis.

kktv.com
u/OkWelcome6293 — 8 days ago

Gazette: How a 14-year-old joined the fight against the Project Taurus data center

If you've seen the document posted about Raeden requesting 300 MW critical, 420 MW gross from CSU, it came from the hard work of a 14-year old. Not being able to vote doesn't stop you from participating in democracy.

From the article:

>"Kyle McGuffey is four years away from being able to vote, but he’s become deeply involved in the debate over a proposed data center in Colorado Springs.

>The 14-year-old heard about the Project Taurus data center from a TikTok video he saw in the spring. The data center, which California-based company Raeden plans to build in a former computer chip manufacturing plant off Garden of the Gods Road, spurred concerns from neighbors about its utility demands and potential noise.

>Kyle said the video raised questions about the environmental impacts of adding such a large business to the city. He started Googling around and searching websites to figure out how to request records from the city and Colorado Springs Utilities. He sent both entities requests for planning documents, environmental impact studies and email communications about the data center."

gazette.com
u/OkWelcome6293 — 1 month ago

COS noise ordinance uses A-weighting (dBa). This systematically under-measures the low-frequency noise (like industrial and data-centers) by as much as 25 dB when compared to C-weighting.

By changing from solely A-weighting to C weighting or both, we can block all data-centers and industrial sites from being built near residential areas.

u/OkWelcome6293 — 2 months ago

KDRO: Colorado Springs Utilities could use nuclear energy

https://krdo.com/news/2026/06/17/colorado-springs-utilities-to-consider-nuclear-energy/

>COLORADO SPRINGS, Colo. (KRDO) - The Colorado Springs Utilities (CSU) Board unanimously endorsed Colorado Springs Utilities’ updated Sustainable Energy Plan recommendations at Wednesday’s board meeting, which recommend research on the use of nuclear energy.

>Presenters explained that this could mean either using a nuclear power plant elsewhere and buying the energy, or building one to own and operate.

>The Sustainable Energy Plan update establishes the direction for the Springs Utilities’ energy transition through 2045. The utility group is working to fill the energy gap that will be left after the Ray Nixon Power Plant shuts down. The state extended the shutdown deadline to 2032 this year.

>Wednesday's informal endorsement by the board is a first step toward beginning research into what they say would best suit the city for the energy transition.

>The utility group says that the near-term plans include using natural gas to provide energy and a request for proposals for 300 megawatts of additional renewable resources by 2030. They say in the long term the plans include a combination of additional renewable energy, such as wind, solar, and geothermal, battery energy storage, market purchases, and small modular nuclear energy.

u/OkWelcome6293 — 2 months ago

Raeden wants to expand Project Taurus data-center to 420 MW

Despite public claims of “50 MW”, Raeden apparently wants to expand project Taurus to a total capacity of 300 MW “critical power”, 420 MW total including facility and cooling load.

u/OkWelcome6293 — 2 months ago

CSU **DRAFT** Electric Integrated Resource Plan (EIRP) shows nuclear power in 5 out of 6 scenarios

Somewhat lost in the news about CEO pay and the proposed net metering plan, this week CSU staff gave an update to the Utility Board about the Electric Integrated Resource Plan. The EIRP is a document CSU is legally required to produce and shows the mid and long term generation to plans and how they intent to meet customer demands and regulatory requirements. CSU last produced this document in 2020. https://www.csu.org/hubfs/Document-Library/EIRP.pdf

The draft EIRP shows 6 different scenarios, with the "reference plan" including 275 MW of solar generation, 800 MW of nuclear, and 50 MW of geothermal energy. Nuclear is included in 5 of the scenarios except the aptly named "no nuclear" option.

I want to stress that this is a draft, and the document is still a ways away from being an approved plan.

u/OkWelcome6293 — 3 months ago

CSU issues RFP for up to 300 MW of renewable generation

https://www.csu.org/blog/quest-for-diverse-energy-future

A couple of weeks ago, CSU issued an RFP for up to 300 MW "utility-scale wind, solar and energy storage projects". The RFP will close on June 5th.

Based on the results of the 2023 RFP which average PPA costs of $23 to $29 per MWh and an average PPA lifetime of 22 years, this represents lifetime PPA NPV of ~$450 million to $600 million, depending on capacity factor of the generation (~.38 for wind, ~.25 for solar).

u/OkWelcome6293 — 3 months ago