Image 1 — Install completed today with new Tesla panels (NJ)
Image 2 — Install completed today with new Tesla panels (NJ)
Image 3 — Install completed today with new Tesla panels (NJ)
Image 4 — Install completed today with new Tesla panels (NJ)

Install completed today with new Tesla panels (NJ)

One Powerwall 3, 10.08kW, 24 of the new 420 (lol) Watt panels.

They delivered everything at 7am, started work around 7:30 and were out of here by 3. System is on but not exporting but powering the home. Once I get PTO I’ll turn on export.

They had to put two panels on the north side of the roof in addition to the 8 that they were already putting there. That will somewhat drop the production but they said they didn’t have room on the front of the house.

Utility is Sussex Rural co-op. Doing this primarily for self sufficiency and power outage protection, not really costs.

u/OriginalCopy4269 — 11 days ago