22-year-old CM student getting let go after nearly 5 months as a PE intern. Was I failed by management, or did I fail to take initiative?

I’m 22 years old, currently pursuing my bachelor’s degree in Construction Management, with an expected graduation date of December 2027.

Before going back to school, I spent approximately two years working primarily as a residential drywall hanger. I have limited experience with metal stud framing. I also spent about a month as a foreman before leaving that position.

I recently spent nearly five months working as a Project Engineer Intern for a large general contractor on a major mission-critical/data center project.
Last Thursday, I was informed that my last day would be the following week because the company “doesn’t need an intern right now.”

I’m trying to understand whether I failed to meet expectations, whether management failed to provide adequate direction, or whether this was genuinely a staffing decision.

I’d appreciate honest feedback from experienced project engineers, superintendents, and project managers.

Here’s the timeline.
Late May – Starting the internship
I started during the last week of May. Initially, I was assigned to a Senior Project Engineer (SPE), who was officially my reporting manager.

In June, another PE1 joined the project. My SPE noticed that this individual and I weren’t getting along particularly well, so he decided to separate us.

He explicitly told me that I would begin working under a different PE1 while the other engineer would work directly under him.

From that moment forward, I understood that my assigned PE1 was responsible for directing my work.

June–August – Working under my assigned PE
For the next several months, I worked primarily under this PE1.

He would assign me tasks through Microsoft Teams or in person. Most of my work consisted of assisting
him with responsibilities that had already been delegated to him by management.

My work included:
RFI and submittal tracking and distribution.
Weekly construction progress reports.
Closeout documentation and O&M tracking.
Document control through ACC/Procore.
Bluebeam quantity takeoffs.
Tracking outstanding items and coordination issues.
Assisting with field coordination and project logistics.

I was initially hired for a 10-week internship.

Toward the end of that period, the project manager approved an extension, allowing me to continue working on the project into the fall semester.

I interpreted this as a positive sign. I figured if they were keeping me beyond my original internship, I must have been contributing something valuable.

Throughout this period, I continued working under the same PE1 because nobody explicitly communicated a change in my reporting structure.

September – Things started changing
Eventually, my assigned PE1 transitioned from the project office into the field.

His own reporting structure changed. Instead of reporting to the project manager, he began reporting directly to the superintendent.

However, nobody explained what that transition meant for me.

Was I supposed to follow him into the field? Was I supposed to return to working under my original SPE? Was the PM now responsible for directing me?

I genuinely didn’t know.

For a while, the PE1 continued giving me assignments, so I assumed our working relationship hadn’t changed.

But approximately two weeks before I was told my internship would end, he started becoming increasingly distant.

He stopped messaging me with assignments, stopped engaging with me as frequently, and generally stopped involving me in his work.

Meanwhile, my original SPE was working closely with the other PE1 and a PE2.

I began feeling disconnected from the project team.
I would see other project engineers being trusted with responsibilities and participating in coordination discussions, while I often had little meaningful work assigned to me.

Trade partners and superintendents generally went to the other engineers when something needed to be resolved.

I wanted to be held accountable for something. Whether that was a specific group of RFIs, a submittal log, closeout documentation, or another defined responsibility, I wanted something I could genuinely own.

Instead, I often felt like an extra person in the office waiting for someone to give me work.

October – Being told my internship was ending
Last Thursday around 3 PM, a member of management sat me down and told me that my last day would be the following week.

The explanation was that they “don’t need an intern right now.”

There was no discussion about poor performance, no formal evaluation, and no mention of a potential return in January.

I was caught off guard.

I had spent nearly five months on this project while attending college full-time, commuting long distances, and trying to establish myself in commercial construction management.

I was disappointed because I had hoped this internship would eventually lead to a full-time Project Engineer position after graduation.

I was also frustrated because, from my perspective, I was never clearly told who was responsible for supervising me after my assigned PE transitioned into the field.

I made a poor decision the following day. I was upset and didn’t come to work Friday, without notifying anyone. I recognize that was unprofessional, and I intend to acknowledge it.

Where I think I may have gone wrong
Looking back, I can identify several things I should have done differently.

First, I should have approached my original SPE or project manager when assignments started drying up.
Instead of waiting for my assigned PE to give me work, I should have directly asked what responsibilities I could take ownership of.

Second, I should have requested feedback earlier in the internship rather than assuming that getting extended meant I was performing well.

Third, I probably relied too heavily on the PE1 I was assigned to.
When he stopped involving me in his work, I essentially lost my primary source of assignments.
I recognize that this is partly a failure of initiative and communication on my end.

Where I think management could have done better
At the same time, I struggle with how my reporting structure was handled.

When I started, I had an official reporting manager.
That manager explicitly reassigned me to another engineer.

For several months, that engineer directed my work.
When he transitioned to the field, nobody sat down with me to clarify whether I should continue working under him, return to my original SPE, or report to someone else.

I was an intern, not an experienced project engineer who had already spent years navigating the industry.
I understand that initiative is important in construction, but shouldn’t management also establish clear expectations and accountability for interns?

If there were concerns about my performance, I would have appreciated hearing them while I still had time to improve.

Instead, I was told my services were no longer needed.

I don’t know whether this was genuinely a staffing decision or whether they simply didn’t see enough value in keeping me.

What I’m planning to do
I’m planning to return for my final week and ask my original SPE for a private conversation.

I want to ask who was officially responsible for evaluating my performance after the extension, whether there were concerns about my work, and what I should improve before my next internship.

I’m not trying to argue my way back into the company. I want to understand what happened and learn from it.

My questions for experienced people in construction management:
Is this kind of ambiguity normal? Should an intern have a clearly established reporting manager throughout an internship, or is it common to work under different PEs without formal clarification?

How proactive should an intern be? Should I have been finding my own work and asking superintendents or other PEs for responsibilities instead of waiting for my assigned PE?

Did I misunderstand my role? I wanted ownership of RFIs, submittals, or other project responsibilities. Was that a realistic expectation for someone with my level of experience?

What does an internship extension actually mean? I interpreted it as a positive assessment of my performance. Was that an unreasonable assumption?
Does this sound like a staffing decision or a performance issue? I understand nobody here can know for certain, but I’d appreciate hearing how managers typically handle these situations.

How should I approach my final conversation with management? I want to be professional without ignoring the lack of clarity I experienced.
I’m not looking for everyone to tell me management was wrong.

If I screwed up, I’d rather hear it now at 22 than repeat these mistakes when I’m 27 and responsible for managing millions of dollars in construction work.
I went from hanging drywall in residential construction to working in a project office on a major data center.

That’s a big transition, and I know I still have plenty to learn.

My goal is to become a competent project engineer, eventually move into project management or field leadership, and possibly run my own construction company someday.

I just want to understand how to become someone a project team can genuinely trust with responsibility.
What would you have done differently in my position?

TL;DR: I’m a 22-year-old Construction Management student with two years of residential drywall experience. I spent nearly five months as a PE intern on a major data center project. My original reporting manager reassigned me to a PE1, who directed my work for months. When that PE transitioned to the field, he gradually stopped giving me assignments, and nobody clarified who I was supposed to report to. I felt increasingly sidelined despite wanting more responsibility. Last Thursday, management told me my internship would end because they “don’t need an intern right now.” I recognize I should’ve been more proactive about communicating and seeking work, but I also feel management failed to provide clear direction. Was this poor management, a lack of initiative on my part, or both?

reddit.com
u/Padroft — 4 days ago
▲ 69 r/ConstructionManagers+1 crossposts

Got locked out of literally every work system with no explanation. Am I getting fired?

I’m an at-will intern at a large GC and this happened Friday morning.
Out of nowhere my company Microsoft account got blocked. Couldn’t get into Outlook, couldn’t log into my laptop, then realized I was also logged out of Procore and Autodesk Construction Cloud. Basically all of my work access disappeared at once.
What’s confusing is nobody on my actual project team seemed to know anything.
I called one of the PEs I work with and he said he had no idea why it happened and started trying to get me an IT number. The safety guy was literally asking me to pick up biscuits for the team that morning, so everyone on site was acting like it was a normal workday and like I was still supposed to be there.
I texted HR and haven’t gotten a response, but it’s also Labor Day weekend now.
I’m an intern and my internship has been extended past its original timeline, so part of me is wondering if some HR end date expired and automatically shut everything off.
The other part of me is thinking this looks exactly like offboarding and I got fired before anyone bothered to tell me.
Nobody has asked for my laptop or badge, nobody told me to leave, and nobody has actually told me my employment ended. But being locked out of Microsoft + laptop + Procore + ACC all at once has me pretty worried.
Has anyone had this happen before? Did it turn out to be an HR/IT mistake, or were you actually being terminated?

Edit: Talked to HR and IT. As most of yall said, it was just an automatic block out caused by not informing HR that I was being extended. I appreciate everyone’s input. This definitely ruined my weekend. At least it’s over