three deck quotes and they're all over the place — what actually moves a bid that far from the first number?
Got three estimates for a deck this summer. One guy had $18k listed for labor alone before materials. I ran the numbers at my desk and couldn't figure out how they got there. Another was half that, and the third split the difference but added a note about possible rot under the existing posts that wasn't in the original scope. I already ripped out the old one last fall so I know the ground is level and there's decent access. Still, the middle price keeps creeping up every time I ask for a clarification. For anyone who bids this kind of work, what usually moves a quote that far from the first number they give? And if the low bid shows up with two guys and a pickup, how often does that end up costing more once they're on site? I'm trying to decide whether to lock one in before the weather turns or just keep stacking the lumber in the garage until next year.