Arc Flash
My employer is in need of an arc flash study. Our facility has never done one and we have gotten 3 quotes. Two are approximately 40k and the other is 10k. The two are actual studies and the third is using the table method. My uppers are obviously interested in cost savings. Im trying to convince them that it is not the same thing and especially since we’ve never had a proper study we should do that. Any suggestions on how to win this argument?
u/Public_Knowledge672 — 3 days ago