
More Resources - More Production Capacity -Lower Unit Costs
Scandium Canada has started investigating more ore resources enabling more production mining and scandium oxide capacity.
More capacity - lower capex costs per ton and as well as lower operation costs.
Resource extension drilling is now underway, targeting a minimum of 200 metres of additional strike length: 100 metres at each end of the currently defined TG zone of approximately 700 metres determined in the 2025 43-101 MRE= Resource Extension from 700 to 900 meters.
Follow-up exploration drilling will test the corridor toward the Discovery Area, extending the prospective footprint from approximately 700 metres today to approximately 1.5 kilometres. = Resource Extension from 700 to 1500 meters.
News Release 10th Aug 2026 at: https://scandium-canada.com/2026-news-releases/