Rigging question
We were unloading bundles of 60' #6 rebar and it was not going well. The bundles kept folding. We eventually got everyrhing done with a few extra straps and some trial and error but I'm wonderin if anyone here has any advice for unloading rebar like that. One load our method ended up being 4 straps and chain spreaders. The second load there were some #11 bundles that we rigged with the 6s to help fight the bend. All done with an excavator.