u/Working-Dragonfly-54

My duct has to go through a block wall, the penetrations are 24x10. My return duct work has to be close to a control joint. Is there a certain distance I need to be away from the joint? No masons on job and GC isn’t much help. Thanks.

reddit.com
u/Working-Dragonfly-54 — 2 days ago