u/iust_me

▲ 34 r/mbta

After like two weeks of closures, the Green line still doesn't work

Got stopped several times today on the C Line. Only got one explanation, "signal failure at Copley". I was told that after the shutdown these would be fixed.

MBTA sits on a throne of lies. :)

reddit.com
u/iust_me — 3 days ago