Looking for a No-Vote Champion for a Structured 1-on-1 Contract Debate
I'm the guy who posted the yes-vote breakdown with the math. The mod has agreed to pin a structured debate thread where only two people post top-level comments: one yes, one no. Everyone else can read and vote but the conversation stays between us.
Format:
- One topic at a time. We finish it before moving to the next.
- Both sides stay anonymous to protect each other.
- You can use whatever resources you want to prepare.
Ground rules:
- Contract citations only. Redline, summary, or Boeing fact sheet.
- No bot/shill/AI accusations. Instant disqualification.
- No moving goalposts. Pick your point, argue it, finish it.
- No edits after the other side responds.
- If you say something isn't enough, name what "enough" looks like. Specifics only.
- Concede points when they land. I will. I expect the same.
I'm looking for one person on the no side who's read the redline and wants to go provision-by-provision. DM me or reply below if you're in.