▲ 2 r/Raytheon
Timekeeping
Switching from Heritage Raytheon to Collins. Was told I have to work both sides 50/50 during a transition period, however there’s no way to charge on the Collins side yet. I was also told I can only charge one side. What do I do and who do reach out to? Management on both ends seems to not have the answers. HR? Timekeeping?
u/Appropriate-Lab-8149 — 2 days ago