u/BairnONessie

P.S.: just realised "this community doesn't allow any attatchments", does anyone know how I could share my mockups to the community? Mockup plans link: https://imgur.com/a/8ri6n9I
If that link doesn't work maybe this does? https://www.reddit.com/u/BairnONessie/s/41TMaIO4dp

Hello all. So we have a kinda wetroom(I guess) bathroom 1.9mx3m in the house we bought last year with no bathtub but a 1.4mx1.9m shower area. The silicone dam and curtain was originally only around a 1.4mx1.4m area leaving a useless strip down the side but I changed that to use the entire wall.

At the very least, one improvement I would like to do is add a tiled(I should be able to source the same already used) seat on the short side, instead of having the showerchair/caddy we use currently. However, we have 3 kids, my wife has a bad back and frankly, I miss being able to soak in the tub.

That being said, we've been tossing up the idea of putting a bathtub down the side of the shower. I'm thinking drop-in, tiles to match. I've done up some mock plans, and was wondering if anyone has something to weigh in, particularly with size and available space in mind. Working off a maximum outside dimension of 1.8mx0.8m, which is a generous bathtub, it should leave the shower drain about 50mm from the side of the bath(which, incidentally, would cover up the side of the room that drains slower). That length will only leave about 600mm between the end of the bathtub and the Vanity though, but it's just a starting point, not a final size.

I haven't figured what I'd do with the curtain either, whether to extend the end/corner of the bathtub into a glass screen and have the curtain butt up to it, or just leave it to the edge of the bathtub anyway and the bath will catch whatever shower water ends up over there.

Oh and I had thought of just putting a bathtub across the back wall, but I don't really want to have to step into a bathtub every time I want to take a shower...

u/BairnONessie — 18 days ago

ZDE.
I had killed a bot operator with the 21 slot bag first thing in the match. However that was in cement plant near the truck. This was found in the construction zone near admin. Never sprinted so fast in my life. Luckily had done the backup power station job earlier so was able to take the paid extract with 10 seconds to go.

u/BairnONessie — 19 days ago