▲ 3 r/Rockville
Permit Application Floor Plans - Non-structural Walls
I am hoping to have a non-structural/load-bearing wall built in my home, and the permit office has confirmed that we don't need an engineering stamp, but we still have to submit floor plans. Has anyone done this and can offer advice* or a sample? The application check-list is set-up to cover any possible scenario, a lot of which won't apply since the wall will not be structural and won't have any electrical/plumbing added. Thanks!
*I appreciate that some people have likely built walls without applying for a permit, and trust me, I'm tempted, but I'm just way to risk averse to do it :)
u/Barbs_not_berbs — 2 days ago