[For hire] looking for data center engineers
Mounting & Configuration of 2 Access Points
• Physical installation and powering on
• Cat6 cabling from switch to AP locations
• IP address assignment for both APs
- Material included for scope
• Cable clips for the routing along the walls or ceilings.
• Keystone Jacks for the AP end.
• Patch panel Terminations at the switch end
• Short Patch cables to connect into the switch or firewall ports if needed