Water Pipe Bonding
Hey guys, on new build. Plumber has gone from the meter in copper , to auspex everywhere else in the house apart from the bathrooms. He has done a auspex feed into the bathrooms and then gone into copper throughout. This is the case in 4 bathrooms.
What’s everyone’s thoughts on the earthing requirements, 4 individual water pipe bonds throughout the house?
Thanks