▲ 0 r/DIY
Bathroom Reno Order of operations
Hello All,
I'll attach some photos for your understanding/reference. But I thought I would ask a lovely community like ours for a little opinion/help.
I'm planning to gut my bathroom, move a door, rip out a closet and rebuild, move the location of the tub and move the location of the vanity. I was hoping you could help me confirm the order of operations!
Gut bathroom, remove drywall, flooring, tub, vanity, closet, toilet, subfloor.
Cut in new door, frame in/cover over, old door. Hang new door?
Move plumbing/electrical as needed for sink/lighting.
Subfloor down. Drywall in place.
Tub in place.
Heated floors/tiling.
Place toilet, vanity, built in cabinet.
Paint.
Thank you very much for reading!
u/ColinBakerst — 2 days ago