u/ColinBakerst

▲ 0 r/DIY

Bathroom Reno Order of operations

Hello All,

I'll attach some photos for your understanding/reference. But I thought I would ask a lovely community like ours for a little opinion/help.

I'm planning to gut my bathroom, move a door, rip out a closet and rebuild, move the location of the tub and move the location of the vanity. I was hoping you could help me confirm the order of operations!

  1. Gut bathroom, remove drywall, flooring, tub, vanity, closet, toilet, subfloor.

  2. Cut in new door, frame in/cover over, old door. Hang new door?

  3. Move plumbing/electrical as needed for sink/lighting.

  4. Subfloor down. Drywall in place.

  5. Tub in place.

  6. Heated floors/tiling.

  7. Place toilet, vanity, built in cabinet.

  8. Paint.

Thank you very much for reading!

reddit.com
u/ColinBakerst — 2 days ago