Arlington residents needed for bike trail design committee
Mystic to Minuteman Design Review Committee Opening:
The Town seeks two residents to join the new Mystic to Minuteman Design Review Committee (MMDRC) to develop a shovel-ready plan for the Mystic River Path Connection to the Minuteman Bikeway. This plan builds on a detailed 2022 feasibility study to expand the region’s trail network and create safer, more connected transportation options for walking and biking between the Mystic River and Minuteman Bikeway.
Planned enhancements include wayfinding, seating, gathering spaces, and scenic overlooks to create a more welcoming public experience for a wide range of users and mobility needs through shared-use paths, pedestrian connections, and bike facilities. Safety and accessibility are central goals, with redesigned intersections and improved ADA access throughout the corridor. For more information and to view the feasibility study, visit the Mystic to Minuteman project page.
The MMDRC will likely meet once per month at a to-be-determined day/time for approximately one year. If you are interested in serving on this committee, send a resume and letter of interest to Claire Ricker, Director of Planning & Community Development at cricker@town.arlington.ma.us. The deadline to apply is June 14th.