u/Foreign-Courage-3207

overnight cafe

so i work overnight making pizzas in the cafe. every night i have anywhere from 5-7 towers of pizzas to make (34 in each tower; 7 cheese 14 pep, 13 meat). 1 tower take me about an hour 15 (ish) to get complete. i already don’t take my 15 minute breaks only my lunch since im trying to get everything done. on nights when there are 7 towers to make (238 pizzas) some times i don’t get to washing my utensils and bleaching the boards and i’ll leave it for the morning. i always sweep the floors no matter what.

my issue is i got in trouble for not completing my cleaning on nights i have 7 full towers to make. i only leave the utensils to make the pizzas and the boards to be bleached. i always sweep the floors and give the counters a quick wipe down.

our cafe is running on 6 people including myself on overnights. i’m a little frustrated that they want us to keep up the same work load and finish 100% everything without allowing overtime or hiring/scheduling better.

reddit.com