IQ Cable - Buying Extra Drops

If I buy a section of 80 drops, can I cut that into 4 separate drops of 10 easily and then sell the other 40? I have a good deal for 80 but want to make sure that it will work for my use case. My alternative is placing 4 orders of 10 which will be more expensive. Thanks!

reddit.com
u/Genius_51 — 9 days ago

Dominos has stopped working with root

I'm no longer able to log into my dominos account because my device is rooted. I'm not sure how or what is causing it, I pass basic integrity and have susfs, play integrity, etc. Any other potential solutions that I could try?

Using OnePlus 15 with KSU next + susfs

reddit.com
u/Genius_51 — 2 months ago

No Clients on AIMesh Node or Router

I'm at my wits end trying to determine the cause of this issue. My aimesh nodes are not picking up any clients, so my regular router is doing all the lifting. However, when I go to the aimesh settings, it shows that both my router and node have 0 clients, so I'm unable to do any binding at all.

Anybody see this issue before or have any checks that I could try? I've tried rebooting, resetting the mesh settings, and removing every node and readding them.

u/Genius_51 — 3 months ago

Would you leave a double carabiner, or just use one?

I received a series of attachments from ritfit for my rack and they all came with carabiners; this will be very helpful when hanging them on a pegboard, but I'm not sure if I should leave them on when attaching to the actual rack since there is already a carabiner on the pulley cables.

u/Genius_51 — 3 months ago

[Selling] Vulcan Kraaken GHD Reverse Hyperextension Machine

Great for lower back development, prehab and rehab. Willing to part for a good price! Located in Pennsylvania

u/Genius_51 — 5 months ago

I will have a ground array of 40 305w panels roughly 200 feet away from my meter, although maybe 220-250 when you consider the bends and turns I will need. I'll be using IQ8MC micro inverters, and the combiner box at the array. Each of the four lines in the combiner box will have 10 panels on their 20 amp breakers.

Enphase doesn't allow aluminum at their products, so I planned on a disconnect at the array and a disconnect at the house with aluminum between those.

My question is, what size wire would I need, and can someone explain the voltage maximum of the wires and how that plays into my system? How many wires would I need to run from my array to my panel at my meter with minimal voltage drop as possible?

Lastly, can anyone tell me what size breaker I would need at the service panel? I'm having trouble calculating the output from panels vs microinverters vs combiner box etc. and I just want another set of eyes before I take it to the electrician. (Taking the enphase training just not done yet).

reddit.com
u/Genius_51 — 5 months ago

I will have a ground array of 40 305w panels roughly 200 feet away from my meter, although maybe 220-250 when you consider the bends and turns I will need. I'll be using IQ8MC micro inverters, and the combiner box at the array. Enphase doesn't allow aluminum at their products, so I planned on a disconnect at the array and a disconnect at the house with aluminum between those.

My question is, what size wire would I need, and can someone explain the voltage maximum of the wires and how that plays into my system? How many wires would I need to run from my array to my panel at my meter with minimal voltage drop as possible?

reddit.com
u/Genius_51 — 5 months ago