Bizarre m.e.n wiring..

Bizarre m.e.n setup

I checked out a job on a block of 5 units (mid 70's construction)

Mainswitchboard on u1. Had an earth stake and m.e.n.

From msb, 16mm (ends in active link) supplying a 2nd switchboard attached to u3 which also had an m.e.n and earth stake. The 16mm then loops out of the active link and continues onto a third switchboard that also has an earth stake and m.e.n.

​

Each unit was metered at their respective swbs..

​

Has anyone seen this? What do you do? Standard interpretation of the rules is "only one m.e.n on a site"..

​

They hadn't run an earth along with the submains, so that would explain the earth stakes but not the multiple m.e.ns..

​