I spent three full days on this part — from programming and fixture building to final machining. It holds a tolerance of 0.02 mm, yet the operations manager said I was too slow, claiming engineers at other companies wouldn’t need this much time.
I’ve outlined my machining process in the video. You can review and learn from the steps. When machining thin-walled shell components, internal stress relief is absolutely critical. After roughing, I heat-treated the stock and let it rest overnight to fully release machining stress and prevent distortion.
I used a Dean 5-axis and DMG 3-axis machine. I had to machine very carefully to avoid part deformation from excessive cutting forces.
After I finally nailed this challenging job, the operations manager complained that it was a trivial part with just a -0.02mm tolerance, and asked why it took me three days. I stayed silent. This part is now in small-batch production. I’m trying to figure out what to say at delivery to make this arrogant person pause. I also want to ask everyone: do you think this lead time is reasonable?