Heatpump location Octopus limitation or not possible.

Heatpump location Octopus limitation or not possible.

Had Octopus out this morning as moving to Solar having got the EV and charger, though might as well go the whole way and replace the gas.

On a positive note my existing Tank was more than capable so it’s just pipe work to that.. then comes the issue.

As the Cosy has a large foot print , they are stating the only place I can have it is next to the family area which is also in the middle of the outside seating area (not a place you want the fan blowing etc).

They can’t fit it where I wanted as point (a) as the pipe work from there over the garage and into the landing would be over 15m
They can’t fit it at point (4) as the width isn’t enough 37 inches - 33 inches
So point (2) is it.. which I don’t want.

My question to those in the know if they can spare a second is could I get away with another option if I didn’t go via octopus and went for a more slimline unit etc.

Thanks in advance

u/Ok-Impact3055 — 5 days ago

How long did you wait for installation after signing (I am using Octopus)

Through the back and forth agreeing the setup 14 panels / Tesla power wall 3 etc the timescale was 8-12 weeks constantly confirmed , paid the deposit signed the contract got a date which means it will be 18 weeks from sign to delivery. What did others wait ? . I feel a little down as I hoped to get a little benefit before the winter but also it’s my fault for the back and forth with Octopus for many months .

Would be interested to know …

reddit.com
u/Ok-Impact3055 — 10 days ago