Shipyard Project and Mason Street Reconstruction
After reading today's Press-Gazette article about the Shipyard District plans/funding and looking at the renderings, I'm wondering if the Shipyard project planning group is in talks with the Mason St reconstruction group. Especially since the Shipyard project is planned by the city and the Mason St reconstruction is planned by the state, I really wonder if they're thoroughly in conversation with each other.
The renderings show Mason St at its current elevation, despite most of the plans proposed for the future of the Mason St bridge involve lowering the bridge. The plans for Mason St do usually include going over the railroad tracks to provide a path across the river that avoids the trains, so I don't know if the renderings or plans would be drastically impacted by the reconstruction.
Mason Street bridge's actual reconstruction timeline (at this moment) would set the construction not to start until 2031, with planning still going on until then. However, the preliminary design will be coming out shortly after the Shipyard project finishes construction. (Shipyard construction estimated to be done in 2027; bridge preliminary design coming out late 2027 to early 2028.) There would be time to redesign things after Shipyard construction is done, clearly, but if they have to redesign things, that's a waste of taxpayer money and time.
I'm looking forward to the Shipyard moving forward, and am hopeful this is a sign that they're moving past the delays and controversy that previously marred this project. I just worry that this will cost a bunch of money and then limit the ability for Mason St to do what's best for traffic patterns and such. I hope they're partnering and doing what is best for the city and its residents.