Capital Beltway Project a mess
Honestly, what’s the point of this project? It took me almost 20 minutes today to get from the Turnpike interchange to 83N because the traffic was backed up trying to merge because of the construction. The crazy thing is the Capital Beltway project is supposed to last until 2033 (probably longer because we all know it will be delayed). All of this because of a project to add an extra lane which has been proven to not fix traffic issues. On top of that, PennDot has to add the Enola interchange construction and 581 construction. It’s honestly such a shitshow. Have almost been rear ended multiple times and seen so many accidents around the construction just because how poorly the road detour and merging is setup.
Do you know what could have fixed traffic issues? A commuter train, possibly connecting Palmyra to Carlisle. If we were gonna go through this long project, why not build something that is universally wanted? Or at the very least, suspend tolls for the Turnpike between Harrisburg/Mechanicsburg/Carlisle so every car in Harrisburg/West Shore isn’t trying to cross two bridges at 7:30 AM.