Chapter 3 → Ecological baseline failure (birds + animals + wetlands)
I’ve been advocating against the Spruce Lake / Lorneville industrial expansion inside the Stonehammer UNESCO Global Geopark. The EIA has major gaps—no full ecological review, missing Species at Risk data, no Indigenous consultation, and wetlands/wildlife corridors treated as “available land.” UNESCO has already acknowledged concerns, but the province is still pushing ahead.
The Musquash Estuary is one of the most celebrated parts of the Stonehammer UNESCO Geopark. It’s featured in brochures, maps, Geopark Week events, and partner-led tours.
What most people don’t realize is that Lorneville is part of the same connected ecosystem and has the exact same biodiversity profile:
- 157 bird species (same number as Musquash)
- wetlands
- peatland pockets
- old streams
- spruce forest
- the tidal inlet
- the wildlife corridor
Species at Risk confirmed in Lorneville: • Canada Warbler (Threatened) • Rusty Blackbird (Species of Concern) • Northern Harrier (Species of Concern)
Plus bats, amphibians, pollinators, moose, bobcat, marten, fox, and downstream marine species.
Here’s the problem: The Spruce Lake Industrial Park EIA did not study the full expansion area or the full range of species and habitats. A one‑morning bird survey in July detected only 27 species, far from the 157 now confirmed.
I’ve raised these concerns with the Minister of Environment & Climate Change, but every time I bring it forward, it gets minimized, even with Species at Risk documented.
I also attempted to trigger a federal Impact Assessment, but the project appears to have been sized just under the thresholds that normally trigger one.
So now I’m turning to public pressure.
If anyone has ideas, experience, or advice on how to escalate ecological concerns when the formal channels aren’t working, I’d appreciate it.
Thank you.