Orange County emails leaked show that I had a hearing set up but Orange County blocked my hearing / evidence from the special magistrate.
To put it in perspective. This is the equivalent of you being accused of a crime. (Having an illegal addition) you having evidence that you are innocent (zoning :
/ inspector admitting this is an original structure not an addition) you submitting the evidence and asking for a hearing. But the prosecutor / opposing council blocking the magistrate from seeing your evidence or giving you a hearing.
The only avenue left for me was to spend thousands of dollars in a lawyer to file an appeal with the circuit court. So now you and everyone in Orange County is spending thousands of dollars of your property taxes fighting a losing battle.
Why do I say is a losing battle? Because the county themselves already admitted that I had a defective hearing in February in their own motion to strike in my circuit court case.
When I told them what their staff said something they claimed they didn’t.. when I showed them phone conversation recap emails, they claimed they didn’t say it that way. when i showed them my very detailed phone notes and transcripts they stopped denying they said it.. but now are threatening block my transcripts from the record so the judge doesn’t see them.
They still won’t close the code enforcement case though. At least they stopped denying they said it .. is that a win?
I’m no expert but this doesn’t seem like an electrical panel of a luxury home in Mexico right?
Is this right? I’m no expert but I feel like they will heat each other up .. also they weren’t bolted down
La constructora me mandó fotos de aplicaron cellotex en la mampostería. Pintaron las cadenas y pusieron hule en el interior.. pero pienso que la razón que se está pelando es por que en lugar de rich, emp, masilla, cellador , pintura .. ellos solo aplicaron emp y pintura.. en el techo.. emp, masilla y pintura.. no cellador y no rich en ninguna parte.. que ustedes opinan? Está es casa nueva .. no la he aceptado
Esto es obra nueva que se quedó en obra gris por creo un año.. se supone que las exteriores paredes deben ser Masilla, Pasta, Sellador (primer), y dos pintadas .. paredes interiores son masilla y pasta com acabado liso antes de dos pintadas.. creo que no lo hicieron así .. la casa se supone que casi ya está acabada pero se empezaron a pelar las paredes de afuera hace un mes.. que piensan ustedes
I came here before and you guys gave me some tips.. I submitted a permit but I’m wondering if this will pass permit in Florida. Going to get rid of those round water valves and install those new ones with the hammer arrestors. It’s all vented with a studor redi-vent
Little background.. Orange County code enforcement made me take out a tiny “addition” .. like a 4 by 4 storage closet. I removed it. However, instead of closing out the violation code enforcement expanded the magistrate order to also include an original laundry room from 1957 that was original to the house. They did this without a fair hearing or having back to the magistrate. I been saying this for months and they finally admitted in a recorded group phone call.
The Orange cunty claims that this 1957 laundry room is an addition and therefore it needs to be permitted.. it’s a long story but I’m trying to contest it but at the same time do what they say..
So I already paid 2500 to an engineer, 2k to an electrician, like 2k in material and about 2k in labor.. yes I know I could have built something much bigger and better but I had 200 dollars per day fines so I had to work with I had and fast.
Trying to save on Plumbing and hoping this will pass inspection..
Im a big fan of this subreddit.. I can do plumbing but I don’t know much about code..
Would this pass code in Orange County Florida?
The laundry 8 by 5 room is enclosed