









What would you do?
We’ve been waiting months for new pool tile to get installed on our fiberglass pool. The contractors finally came yesterday to start and I’ve already got several concerns.
First, I was told they were going to go around and sand down the concrete pool coping lip that goes around the entire pool as there’s been some patch work done. However rather than do that first, they already slapped the tile on the sides of the pool. How the hell does that make any sense? I came outside at one point to mention the sanding and they said they were going to take care of it, but idk how they’re going to be able to do it without making a mess on the new tile or not scratch the new tile with their grinder wheels/sanders. Feels like they should have sanded first to smooth out the coping and then done the tile.
Second, I’m noticing some large gaps in some areas between the tiles or sections where the tile is not straight or leaves too much of a gap between the top of the tile and the coping.
I’m trying really hard not to micromanage but it’s getting hard when contractors don’t care about the little details or have questionable logic. We paid a lot of money for this ($6k) so I want it done right.
How would you handle this situation?