Escapement setback
Edit: Spelling.
Escarpment setback
I’m dealing with a new sanitarian and his interpretation of intersecting layers is much different than mine.
I can get the required 125’ per 150 gallons to fit in the only suitable area for a repair and maintain a 25’ setback from the natural down gradient escarpment.
He drilled one 10” deep hole in the center of the proposed area and has determined I need a 50’ setback unless I install a pretreatment system.
The rule is open to interpretation and his seasoned predecessor would have definitely approved my plan.
Any soil or regulators or designer people with suggestions on how I could “argue” this?
Adding another 20k for a pretreatment system when I feel he’s misinterpreting the rule is really bothering me.