Drywall contractor says I'm being too picky for level 4.

I am building our forever home and I am the owner builder. My first time building. I will be into the build for around $950,000 when I'm finished. 5800 sqft home.

The drywall company that I hired said it would take 2 weeks from start to finish to hang the sheetrock, mud to a level 4 finish and spray with a very light orange peel. Today makes day 39 that they have been on the project. We are almost a month beyond the original 14 days.

They are saying that they have delivered a level 4 finish. When they showed up today to spray the texture I told them not until they go over the house and fix the issues I found this morning. He says I'm being too picky and the texture will cover this.

I'm beyond frustrated. The contractor said that these things are only visible because I'm shining a light right up close and that an inspector would only shine a light from 4 feet away to judge the condition of the drywall.

(Edit)- $27,000 for drywall mud and texture. We are still in the rough-in phase so the house does not have electricity inside but there is a temporary power pole outside for them to run extension cords. I took the pictures with my DeWalt light shining on the wall otherwise it would be dark. Reddit would only let me post 20 pictures. I have over 120 pics of blue tape that I put up today.