Issue with charging power from grid to BAT limit - also blocking charging off solar surplus
Hi all,
I'm trying to set up a behaviour under time-based control where this happens:
- If solar production > house load, charge the battery
- if house load > solar production, import surplus from grid
- do not charge the battery from the grid
I thought I'd be able to manage this behaviour by setting up a Charging timing block but limiting the "power from Grid to BAT" control to 0 kW. However, this seems to also prevent the solar surplus from charging the battery and instead it just exports the surplus to the grid. Am I doing something wrong? Is there another/better way to get this behaviour?