PR application cancelled due to incomplete schedule A
Hello!
I applied for PR, got my AOR which I used to apply for BWOP. Anyways, I got an email last week asking me to upload my TCF pdf results and schedule A signed.
I filled out the schedule A, made sure no gaps whatsoever are in it. I even create a separate document where I completed my work history since the space in their original document was insufficient.
To my surprise, this morning I get an email saying my PR application was cancelled due to an incomplete schedule A.
The only issue I can think of here is when I filled out the document it wouldn’t let me sign it, nor verify it to get the QR codes at the end. I made some research, and found out that when this « glitch » happens some people just print it, scan it and send it. So I did the same, and I dont think that was right to do.
Im just so LOST. Not feeling like restarting the whole process from scratch especially that I put so much effort and time into it. And the worst part is not knowing if i will be lucky with a low draw anytime soon.
I got letter stating that I’m allowed to work for a year while they process my BWOP. So that will get rejected soon as well as soon as they find out that my PR application got canceled.
Any advice please?? Has anybody been through same or similar situation.
Thanks everyone!