Concrete Pool - drying time.
I'm building a concrete pool, 1.8m deep, 12m long and 7m wide, with a beach type slope from one side to the other (1:7 slope). The pool will be about 600mm above ground. It's not a perfect square, by design.
The concrete will be applied via shotcrete/gunite by some professional people. Since a truck can drive on concrete within 7 days, what would be the drying time enough to fill the pool with water?
I'll ask the concrete guy when I see him but thought I would ask. This is in a very warm climate (30degC).