
Not sure if this has been posted before, but looks a bit hellish
I would NOT want to try and play this.

I would NOT want to try and play this.
FYI the JPL accessibility lab is currently closed due to technical difficulties. If you need to find an alternate location with the access you need, reach out to the SDS, either your advisor (SDS, not academic), or if they are not available, the SDS front desk
further plumbing work is ongoing in the JPL. This will increase the amount of noise in the JPL unfortunately. Work is due to be completed by Monday.
Due to plumbing issues in the John Peace Library (JPL), restrooms on the second, third and fourth floors are currently unavailable.
Several corridors within the building are also closed due to standing water. Please avoid these areas and follow any posted signage.
Facilities is actively working to resolve these issues and restore access as quickly as possible.
Banner (ASAP,. RowdyPay, Degreeworks, myUTSA, etc) will be down tonight from 5PM, 8/31 to 9/1 8:30AM, due to end of fiscal year processing
Due to the extreme heat index and wait times at the Student Union Tech Café location, UTS is temporarily closing the Tech Café SU location and relocating staff to the Mesquite Room (SU 2.01.24) on the 2^(nd) Floor of the Student Union next to the Denman Ballroom to better streamline operations for both passphrase resets and tech support for our campus community.
Map of Student Union here: https://www.utsa.edu/studentunion/map/index.html
UTS is currently setting up power, seating, and signage
https://lib.utsa.edu/services/technology-lending
FYI the queue for borrowing a laptop from the library for the full semester is now open
Apply quickly, as they DO go quickly.
Unlike previous years, the downtown library IS available for pickup.
Banner, which includes ASAP, myUTSA, DegreeWorks, Rowdypay, will be down 7/31 to 8/2 5PM to 5PM, due to mandatory vendor patching.
FYI, Downtown library is under construction, but still open.
Front Desk will sometimes be in a temporary location. Please follow signs.
Tech gear supplies will be limited at downtown.
Reserves WILL still be available.
Study rooms are down to just 3, while the other 4 are rebuilt.
Lab computers WILL be available, but their location will be moved from their previous location. Again pelase follow signage
Note, there WILL be a significant amount of noise during this summer project.