Moving charging station and remapping
Hi everyone! I have a couple of questions for GOAT 3000 owners (or anyone with a similar LIDAR mower).
I’m thinking about moving the charging station to a different location. If I do that, will I have to remap the whole yard? I assume the answer is yes, but I wanted to check with people who have actually done it.
Also, what about winter storage? If I bring the robot and charging station inside for the winter and then put them back outside in the spring, the station will probably end up a couple of inches from its original spot. Would that require a full remap too, or will the mower figure it out?
Thanks!