






The Charleston SC Coal Tipple
The saga continues. I didn’t like the look of the front and back parapets. I added the width of the column when I built it instead of just doing the column so I redid the parapets and I added about 1.5mm strip stock to the side walls’ height for the roof slope to match the parapets’ slope.
I also started working on the concrete foundation/pier. Using .030 sheet I fashioned the floor and the pier sides. I used some rectangular tubing to give the pier depth and to add surface to attach the footers.
I found some HO scale pier footings to use for the building and trestle footings; unfortunately when I started placing them I found that they are not the same height and they are not level either. They will be perfect for the Central Valley bridge supports I ordered (which is their intended use).
Back to the drawing board…