![[X2] at [Six Flags Magic Mountain] has permanently closed](https://preview.redd.it/1sm4d23y56kh1.jpeg?auto=webp&s=244caca0391afb6d34a385325ca3befc39d8a042)
u/Intelligent-Pop1387
![[X2] at [Six Flags Magic Mountain] has permanently closed](https://preview.redd.it/1sm4d23y56kh1.jpeg?auto=webp&s=244caca0391afb6d34a385325ca3befc39d8a042)
[Steel Vengeance] at [Cedar Point] is closed for the remainder of the 2026 season
Well, its official. The wikipedia editors already got Kumba and Arieforce 💔
rest in peace [Kumba] & [Arieforce One]
Kumba 4/21/93 - 8/2/26
Arieforce One 3/31/23 - 8/2/26?
digital recreation from an extremely successful video game platform
If I had a nickel for every time an iconic green and teal jungle themed coaster permanently closed with little to no warning...
[Busch Gardens Tampa] Kumba will close on August 2nd.
outjerked by a 2011 Six Flags PR guy's twitter post trying to bag Anne Hathaway
[arieforce one] relocation to kennywood concept
After hearing the tragic news of fun spot atlanta's closure I immediately thought of what they could do with arieforce one. I wondered where it could possibly be relocated when I thought, what better place to put it than my home park, Kennywood.
When looking at this you might think "hey that just goes through every path, ride, and building" This was a difficult problem to solve, which is why I naturally went with a simple solution: adding 50 ft of extra supports to the bottom of the ride to make it go over all of the pathways and other things. That way it has better statistics to it's name while avoiding having to demolish anything around it.
I fully believe my plan could work as it gives my home park a way better coaster lineup while also saving one of the greatest roller coasters in the US. If there are any questions I would be glad to answer them and Im open to feedback.
thoosies on normal sub vs jerk sub [coaster boy]
I count each individual seat on a coaster as its own credit, AMA.
As someone with 241 credits and only 65 coasters ridden, I can see how some people might disagree with my lifestyle, but I think of it as the best way to count credits because it's a different ride experience with every seat.
Racing coasters: do you count them as 2 individual credits or one singular credit? [other]
When looking at my credit count I realized that [Gemini] at [Cedar Point] is the only racing coaster that I have ridden each side of. And now I don't really know if I should keep it as one credit or put it as two because while both sides are mostly the same experience they do have slight differences. Plus you board each side seperate as opposed to mobius loop coasters like [Twisted Colossus]. So now I'm thinking it should be two credits but I'm still unsure, what do you guys say?
Am I the first person to bring a 2007 Lego Star Wars Phase 1 clone trooper onto Iron Gwazi and Montu?
My Lego Star Wars: The Clone Wars 2007 Phase 1 Clone Trooper now has 6 credits after visiting his first park, hoping to bring it up to 15 by the end of 2026.