Engineer/Construction Drawings
Has anyone ever changed their engineer?
I’m at very early stages, waiting 2 months for construction drawings that were invoiced and paid for, still no sign of them.
The engineer has not contacted me and has ignored texts.
I’m worried this is a sign of things to come.
Once I hopefully do get the construction drawings, am I entitled to the Cad file?