Whats the longest program you wrote and pressed cycle start on?

Whats the longest program you wrote and pressed cycle start on?

This vacuum form mold Took a total of 55hrs. This op is only finishing.

u/Murmjr — 14 days ago

Mold Insert

Sadly this was scrap, used too big of an andmill so there was too much engagement. Still a pretty desk weight though.

The tiny black spots on the 1st pictures are 0.5mm holes for the vacuum.

u/Murmjr — 4 months ago

PSA: Enshittyfication of AEVOR

8yeara ago i bought an AEVOR Daypack Proof for around 120 bucks. It was my daily driver, comfortable almost absolutely rainproof and lots of expandable space. Rhe Zipper finaly gave out.

The New one lasted about a month before it ripped open at the attachent point of the strap. They offered me 20 Euros to let it get fixed, lol.

I bit the bullet and bought an Alphaoneniner evade 1.5.

reddit.com
u/Murmjr — 5 months ago

some inspiration for the nex satisfying render video

u/Murmjr — 5 months ago

RIP to my favourite Fidget toy

Rip to my exocet 2023-2026

The spring in my exocet broke, and as im based in europe, sending it in for waranty is off the table. If anyone knows where i can buy this spring, let me know.

u/Murmjr — 5 months ago