First time working with someone hands-on, definitely the junior in the situation, how to handle their unreasonable expectations
I've inherited a project from someone else (documentary) and have my first real situation with unrealistic and unreasonable expectations from my boss (director/producer/editor). After having previously done some work with him as his assistant editor and editing smaller projects. For example, on a related project I made 10 or so 5 minute scenes for a live show. This project however is much larger in scale and it seems like he is not reflecting that in what he expects. For one, I've come in half way, basically had to reorganise and start from fresh which isn't being reflected in any timescales, but he seems to expect me to be able to hit deadlines which are basically impossible given as I am only contracted to to work for him 3 days a week (for context in that time I am being asked to basically finish and foley nearly an entire 40 min episode which I think is pretty unreasonable, especially to do to a high quality). I think the main problem is that I am constantly being asked to show my work with shorter deadlines which really negatively affects the amount of time I have as it forces me to break up my workflow (for example, I would normally wait to do a lot of things after when I'm completely happy with the story but I feel I have to instead do a lot of the tedious things earlier which obviously sets me back if it has to change). I've tried before explaining that there is going to be some sort of trade off to working at speed in the quality that I can produce, but because I am very much the junior in this situation it feels like I have very little fightback. Would anyone have any feedback because I'm still new to this career and want to know how I can deal with this.